Land and furniture are extra. Beyond that we do not publish a fixed inclusions list, because the treatment of taxes, permits, consultant fees, pools, retaining walls, landscaping, utility connections, earthworks and unusual site conditions changes from project to project — and package names alone do not establish concrete grades, finish brands, structural systems or equipment specifications.
Each quotation sets those out explicitly, along with the method for measuring built area — including terraces, balconies and covered outdoor areas.